PROJECT

The project calls for the construction of a University building in Dubai, UAE. The scale of the project we were involved in includes 800,000 Sqft le: B+G+2+R. TWE worked with the contractor to develop a pre-tendering simulation which was requested by the client in order to know about the contractor's construction methodology that he would adopt on being awarded the project.

SOLUTION

Our scope was to develop the Pre-tendering 4D simulation. The simulation was prepared based on the consultant's LOD 300 BIM model received, adding the construction milestones for the addition of the time dimension to the 3D model and developing a 4D simulation as a product.